Site Overlay

Works

MEGA MOVABLE SHELTER

  • Client : Keppel Fels Limited – Crescent Yard
  • Project : Mega Movable Shelter (Blk 11 & 12)
  • Blk 12 – Size: 60m(w)x30m(h)x20m(l)=5 nos
  • Blk 11 – Size: 48m(w)x30m(h)x20m(l)=4 nos
  • Weight: 1720 tonnes
  • Scope of work : Supply, Fabrication,Sand Blasting,Painting and Install Steel Structural work Including Metal Roofing and Wall Cladding.

HDB LIFT UPGRADING

  • Client : HDB
  • Project : HDB Lift Upgrading
  • (C62,C63,C6A,G7D,G10E,G13B,G13C,G13D,G12F&G16B )
  • Weight: 5000 tonnes
  • Scope of work : Supply, Fabrication, Galvanizing, Painting and Installation of Structural Steel Lift Shaft and Landing Beam

WAREHOUSE

  • Client : Keppel Shipyard Limited – 51 Pioneer Sector 1
  • Project : Proposed 1 Block Single Storey Warehouse & 2 Blocks Single Storey Workshop
  • Weight: 1200 tonnes
  • Scope of work : Supply, Fabrication, Sand Blasting, Painting and Installation of Steel Structural Work Include Piling Works, Civil Works, Fire Rated board, Aluminium Louvred, M&E works, Metal Roofing and Wall Cladding.

OTHERS

  • Project : Outfitting Works, Linkway, Steel Platform, Aluminium Staging Platform,Gangway, Gangway Tower, Heavy Duty Platform Tower, Spiral Staircase, Knowledge Center and Mobile Shelter
  • Scope of work : Supply, Fabrication and Installation, Include Galvanizing, Sandblasting and Painting